Skip to content
EN
Language DE DeutschPL PolskiEN English
Request a quote
Dammstraße · Esslingen am Neckar

Aus einer Messi-Wohnung wird ein Zuhause

A badly neglected three-room flat on Dammstraße in Esslingen — fully renovated in three weeks and handed over ready to move in.

Living room after the renovation: new floor, fine plaster, new radiator
Living areaapprox. 57 m² · 3 rooms
Duration3 weeks · Sept/Oct 2025
TradesPlumbing, electrics, bathroom, plaster, floors, heating
ClientPrivate · handed over ready to move in
Starting point

The flat was in a state nobody could move into: destroyed floor coverings, filthy sanitaryware, outdated pipes and electrics. Renewing the surfaces would not have been enough — the flat had to be stripped back to the shell.

Room before the renovation with a damaged floor
Before · Room before the renovation with a damaged floor
Work

What we did

01

Strip-out

Old floors, sanitaryware and fittings removed and disposed of.

02

Plumbing

New water and drainage pipes throughout the flat.

03

Electrics

Completely new electrics with new cables, boxes and connections.

04

Bathroom

A new bathroom with sanitaryware and all tiling.

05

Walls & ceilings

All walls and ceilings in fine plaster.

06

Floors & heating

New flooring in every room, new radiators.

07

Doors

The old doors restored instead of replaced.

In the client's words
„I never thought you could turn it into such a great flat!“

A.J. · Client, Esslingen

Photos

Before, during, after

Video walk-through

A walk through the finished flat

Every room in one go, filmed after the work was done — this is how the flat looks today.

Dammstraße · Esslingen am Neckar

Your project

Planning a similar project?

Give us a call, message us on WhatsApp or send a short enquiry. Site visit and quote are free of charge.