What matters
What matters in interior finishing
Clean interior finishing starts with the substrate. Old walls in existing buildings are rarely straight, and plaster is often hollow or cracked. Cutting corners here shows up later in every raking light. That is why we check substrates first and level them with plaster or drywall.
With layout changes, the structure is decisive. In our project on Fürststraße in Tübingen we opened a stone wall around 55 cm thick and carried the load with two iron frames. We only open walls with a structural engineer who approves every step.
The right sequence saves money: pipes and cables before plaster, plaster before flooring, flooring before doors. Because we coordinate every trade ourselves, nothing has to be opened up again.